Files
Project-M/Docs/Vault/06_Roadmap
kronic d9c383cf33 Docs: LANTERN Phase 6/7 design notes (finale + station) — per-phase coverage complete
- Phase 6 (finale): shelf-boss on the BossState/BossAISystem chassis (multi-phase reskin,
  signature-Spark drop); one scripted Serpent-tide via the world-model burn/un-pin + hazard
  director + loss-floor, Siren-forecast; Loudness-driven co-op scaling.
- Phase 7 (station/voices): the hub = the world-model permanent home pocket; Lamp meter =
  GoalProgress + visible growth; rack/bench/library/Bell reuse class-swap/sockets/culture/
  transit; Keeper (OnboardingSystem skin) + Siren (hydrophone) + lamp-morse; tone bible gates barks.
- Roadmap index now links all phase design specs (full slice designed).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-14 00:00:39 -07:00
..